New Peschiera Aqueduct
read more
This project focused on the construction of a new sector for the upgrading of biogas in the Roma Nord purification plant, located downstream of a new dedicated pre-treatment section. The plant has been designed to improve energy efficiency, reduce environmental impact, and optimise service charges, continuously generating around 1,400,000 Sm³ per year of biomethane.
Project details
Biogas upgrading line with nominal capacity of 260 Nm³/h.
Control and measurement cabinet (REMI cabinet) for controlling the quality and quantity of biomethane fed to the network.
Post-combustion section of the off-gas exiting the upgrading membranes.
Customer | Acea Ato 2 |
---|---|
Site | Municipality of Rome |
Timetable | Start: February 2023 |
Detail of the service | Engeneering services during the execution of works (Works Management)
|
Service execution quota: 100% Acea Infrastructure SpA
Amount of works: 5.885.500 € (di cui 118.300 € costi della sicurezza)
Nominal flow rate of wet biogas entering the line
Average volume content of CH4 in wet biogas: 65 %
Average volume content of CO2 in wet biogas: 30 %
Average volume content of CH4 in biomethane: > 97 %
Guaranteed purification efficiency > 99,3 %
Average volume content of CH4 in the off-gas: < 2 %
Hours of plant operation per year (expected value): > 8000 h/anno
Hours of plant operation on a daily basis: 24 h/giorno
Max expected biomethane potential on an annual basis: 1.400.000 Sm3/anno